
Check out the European Warehouse 3000W Electric Scooter Harley City Coco EEC Electric Motorcycle. Its robust 3000W motor provides ample power for smooth acceleration and cruising. Designed with a stylish Harley - like appearance, it stands out on the road. The EEC certification guarantees its compliance with European standards. The high - end seat is crafted for maximum comfort, allowing riders to enjoy long trips without fatigue. Being in our European warehouse means faster shipping for European customers, ensuring they get their hands on this fantastic ride in no time.
Item No :
CP-4.2 maxOrder(MOQ) :
1Payment :
T/T 30% as deposit, and 70% before delivery.Product Origin :
Zhejiang, ChinaColor :
White, Orange, Red, Yellow, Gold, Blue, Black, Green, SilverWeight :
Gross weight of a single product: 85.000 kgModel | Two-wheeled scooter |
Top speed | 40-60 km/h |
Voltage | 60V |
Brand | YHZ |
Range per charge | 100-120 km |
Charge time | 6-8 hours |
Certification | EEC COC |
Maximum load | 200 kg |
Tire Size | 17-inch front, 12-inch rear |
Custom logo | Minimum order quantity: 10 units |
Custom packaging | Minimum order quantity: 50 units |
Custom graphics | Minimum order quantity: 50 units |
Quantity (units) 1 - 20 | > 20 |
EST Time (days) 15 | To be determined |
Motor | 3000W |
Battery | 60v60ah removable lithium battery |
Suspension | Front and rear shock-absorbing suspension |
Lights | Headlight/Taillight/Turn Signals |
Certifications | EEC/COC |
Maximum Speed | 40-60 km/h |
Charger | 6A fast charger |
Tire Size | 17-inch front tire |
Other | Horn/Speedometer/Rearview mirror/Siren |
Q1. What are your packing terms?
A: Normally, we pack our goods in neutral white boxes and brown cartons. If you have a legally registered patent,
we can pack the goods in your branded boxes after receiving your authorization letters.
Q2. What are your payment terms?
A: T/T 30% as deposit, and 70% before delivery. We will show you photos of the products and packages before you pay the balance.
Q3. What are your delivery terms?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Normally, it takes 30 to 60 days after receiving the advance payment. The specific delivery time depends on the items and quantity of your order.
Q5. Can you produce according to samples?
A: Yes, we can produce according to your samples or technical drawings. We can build molds and fixtures.
Q6. What is your sample policy?
A: We can provide samples if we have stock, but the customer has to pay the sample cost and courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we do 100% test before delivery